
Built by SACIM in diamond-rich Miabi zone
Installed capacity: 12 MW
3 MW powering Mbujimayi & surroundings
SOGEAC transmission line under construction
Industrial tourism & engineering education
National infrastructure development
The Barrage de Tubi Tubidi is a significant hydroelectric infrastructure project located in Miabi Territory, Kasaï Oriental Province. Built by SACIM in the diamond-rich zone, the dam has an installed capacity of 12 MW, with 3 MW dedicated to electrifying Mbujimayi and surrounding areas. SOGEAC is currently constructing the energy transmission line. This site represents a major opportunity for industrial tourism, offering visitors insights into energy infrastructure, engineering achievements, and national development efforts in the Grand Kasaï region.
Our travel experts can craft a personalized itinerary for your Congo adventure.
Year-round, though dry season (May-September) offers better access.
Located in Miabi Territory. Advance arrangements required for site visits. Contact +353 8994 43480 or travel@drctourism.com. Follow all safety guidelines during industrial site tours.
-6.3000°, 23.7000°
Map integration coming soon
Last updated: February 2026
Reviewed by DRCTourism Research Team — Destinations & Conservation Division